Text Box: Photo Detail

Bathroom Remodel

Here we made some changes to the layout in this small 2nd floor bathroom.

The tub and shower were tore out and we built and stand up shower with a seat. The toilet was moved over so we could build the frame for a drop in  Jacuzzi.

We installed a new vanity and tiled the floor then added the little touches.

The

Downriver Handyman

Service Plus

Takes pride in the work we do